![]() The preface of the manual describes how the manual will be used in our operations. Many changes and upgrades have been made to this manual based on comments from the Drill Teams and Drilling Support Groups. This manual replaces the Transition Version 1 manual dated October 1999. To: ExxonMobil Drilling Employees The enclosed manual is the First Edition of our EMDC Drilling Standard Operations Manual for Jack-Up/Platform/Barge Drilling. ![]() Box 4876 Houston, TX 77210-4876ĭRILLING OPERATIONS MANUAL - JACK-UP/PLATFORM/BARGE RIG DRILLING First Edition - May, 2003ĮMDC Drilling Standard Operations for Jack-Up/Platform/Barge Drilling STANDARD OPERATIONS MANUAL for JACK-UP / PLATFORM / BARGE DRILLINGįirst Edition May 2003 FOR COMPANY USE ONLYĮxxonMobil Development Company P.O.
0 Comments
Leave a Reply. |